Grant 28 Documentation

Description Date
Talbert and Bright October 2, 2012
Work Authorization 11-08 - design and bidding services for the Hilton Head Airport
Beaufort County and Wilbur Smith Associates February 15, 2011
Task Order 1 Modification - providing professional services to facilitate the trimming and/or removal of both on and off-site trees obstructing the Part 77 airspace of the Runway 21 (north) end approach to the airport within the limits of the (34:1) trapezoidal approach surface, and also fo the mitigation by plant-back of lower-growing vegetation in those areas. The Engineer shall provide professional services for this work which include field surveys, construction plans and specification from tree removal, construction plans and specifications for mitigation/plant-back, preparation of permit applications and bid phase services.
Wilbur Smith Associates April 22, 2010
Correspondence regarding Tree Work
Beaufort County and Wilbur Smith Associates April 2, 2010
Task Order 1 - to provide professional services to facilitate the trimming and/or removal of both on and off-site trees obstructing the Part 77 airspace of the Runway 21 (north) end approach to the airport within the limits of the (34:1) trapezoidal approach surface, and also for the mitigation by plant-back of lowering-growing vegetation in those areas. The Engineer shall provide professional services for this work which include field surveys, construction plans and specification for tree removal, construction plans and specifications for mitigation/plant-back, preparation of permit applications and bid phase services
Green Acre Services, Inc. August 8, 2009
Certificate of Liability Insurance
Letter from Town of Hilton Head Island March 18, 2009
Documentation concerning Grant 28
Beaufort County and Wilbur Smith Associates August 7, 2008
Task Order 3 - consists of all work items identified in the FAA, FY-08 AIP Grant for the Hilton Head Island Airport (HXD). These work items include the following: FY-09 DBE Plan Update (both airports); Air Carrier Terminal Improvements (Design); Air Carrier Apron Joint Material Replacement (Design); RSA Drainage Improvements (Design); and Enhanced Taxiway Centerline Marking (Design and Construction Administration).
Beaufort County and Wilbur Smith Associates April 4, 2008
Task Order 1 - to provide necessary professional services to produce an update to the Disadvantaged Business Enterprise Plan for the Beaufort County Airports
Beaufort County and Wilbur Smith Associates July 31, 2007
Task Order 5 (Amendment 2) - Amendment to original Task Order 5 dated April 28, 2006 which detailed professional services for the development of the Hilton head Island Airport. This amendment directs the Engineer to prepare a Change Order containing modifications ot the project plans and technical specifications in order to alter the scope of work fo the project by which a lighted sign is added to the existing airfield signage, as well as directs the owner to pay the Engineer an addition fee for these services.
Invoices NA
Paid by Grant 28